Client Case Studies
Davey Civils have successfully delivered a wide variety of project works, each with their own unique set of challenges, complexities and requirements. Click on a client case study to learn more.
Case Studies
As part of our £2.8m contract with Balfour Beatty, Davey Civils installed a challenging temporary works scheme, which allowed the construction of an interceptor chamber.
As part of Thames Waters £14m SUDs scheme to capture surplus surface water and put in back into the Thames, Davey Civils installed 870 meters of 1.2 – 2.4 diameter concrete and Polypipe to a depth of 5m.